§ 90-11. Requirements of high strength wastewater generators.
All users with discharge waste strength greater than normal wastewater shall prepare and file with the city a report that shall include pertinent data relating to the wastewater characteristics, including the methods of sampling and measurement to obtain this data, and this data shall be used to calculate user charges. The city shall have the right to gain access to the waste stream and take its own samples. Should the city do so and should the results be substantially different from the data submitted by the user, the charges shall be revised for the next billing cycle/period. These requirements are in addition to the requirements as set forth in section 90-125.
(Code 1979, § 31-11)